EasyManua.ls Logo

Hitachi RAS-(4-12)HNP(1)(E) - Checking Procedure for the DIP-IPM Inverter; Inverter Module Checking Procedure

Hitachi RAS-(4-12)HNP(1)(E)
498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Troubleshooting
303
SMGB0087 rev.0 - 12/2013
8
8.4.2  Checking procedure for the DIP-IPM inverter
RAS-(3-6)H(V)N(P/C)1E
High voltage discharge work for replacing parts
C A U T I O N
Electrical hazard. Risk of electrical shock. Perform this high voltage discharge work to avoid an electric shock.
1  Turn OFF the main switches and wait for three min-
utes. Make sure that no high voltage exists. If LED201
is ON after start-up and LED201 is OFF after turning
OFF power source, the voltage will decrease lower
than DC50V.
2  Connect connecting wires to an electrical soldering
iron
3  Connect the wires to terminals, P and N on DIP-IPM.
(The discharge voltage can perform even when con-
necting the wires to terminals
#1(P) and #3(N) of
connector “PCN201”) => Discharging is started, re-
sulting in hot soldering iron. Pay attention not to short-
circuit between terminal P(+) and N(-)
4  Wait for 2 or 3 minutes and measure the voltage once
again. Check to ensure that no voltage is charged.
DIP-IPM
Connecting wires
Electrical
soldering iron
Plug
Inverter module checking procedure
Rectier circuit of inverter PCB
Internal circuit of rectied part of DIP-IPM
Remove all the terminals of the inverter PCB before
checking.
Non-faulty if [1] – [8] are checked and satised.
Measure with 1 kΩ range of a tester.
R
S
T
52C
N O T E
DO NOT use a digital tester.

Table of Contents

Related product manuals