EasyManua.ls Logo

Hitachi RAS-(4-12)HNP(1)(E) - Center of Gravity

Hitachi RAS-(4-12)HNP(1)(E)
498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Unit Installation
18
SMGB0087 rev.0 - 12/2013
2.3 Centerofgravity
HangingMethod
When hanging the unit ensure the balance of the unit check safety and lift it up smoothly. Do not remove any packing
materials and hang the unit under packing condition with two ropes as shown below. At leat two persons are needed to
move the unit.
RAS-(2-2.5)HVNP1
RAS-3HVNC1
a. 515 mm
b. 180 mm
h. 275 mm
1
RAS-3HVNP1E
a. 600 mm
b. 195 mm
h. 370 mm
1
RAS-(4-6)H(V)NC1E
For 4 HP:
a. 590 mm
b. 195 mm
h. 510 mm
For 5-6 HP:
a. 610 mm
b. 195 mm
h. 490 mm
RAS-(4-6)H(V)NP1E
a. 613 mm
b. 190 mm
h. 590 mm
RAS-8HNPE
a. 610 mm
b. 195 mm
h. 570 mm
RAS-8HNCE
a. 615 mm
b. 190 mm
h. 560 mm
RAS-10HNPE
RAS-10HNCE
a. 610 mm
b. 195 mm
h. 565 mm

Table of Contents

Related product manuals