EasyManua.ls Logo

Hitachi RAS-(4-12)HNP(1)(E) - Checking Method of Fuse for Fan Motor Protection (EF1); High Voltage Discharge Work for Replacing Parts

Hitachi RAS-(4-12)HNP(1)(E)
498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Troubleshooting
306
SMGB0087 rev.0 - 12/2013
Checking Method of Fuse for fan motor protection (EF1)
(Measure the resistance under 1 kΩ range of a circuit tester.)
N O T E
DO NOT use a digital tester.
By placing the
+
and
-
side of tester to EF1 on inverter
PCB, measure the resistance.
If the resistance is 0Ω, it is normal.
Circuit
Tester
Place wires to
specified terminal.
+
-
EF1
Refer to (1)
“Detail of Check Points
about details.
Contact with specied terminals
to measure.
Tester
RAS-(8-12)HN(P/C)(E)
High voltage discharge work for replacing parts
C A U T I O N
Electrical hazard. Risk of electrical shock. Perform this high voltage discharge work to avoid an electric shock.
1  Turn OFF the main switches and wait for three minutes. Check
to ensure that no high voltage exists. If LED2 is ON after start-
up and LED2 is OFF after turning OFF power source, the volt-
age will decrease lower than DC50V.
2  Connect connecting wires to an electrical solder bit.
3  Connect the wires to terminals, P and N on IPM. => Discharging
is started, resulting in hot solder bit. Pay attention not to short-
circuit between terminal P and N.
4  Wait for 2 or 3 minutes and measure the voltage once again.
Check to ensure that no voltage is charged.
1
2
3
4
Solder bit
Plug
Connecting wires
Transistor module

Table of Contents

Related product manuals