EasyManua.ls Logo

Hitachi RAS-4HRNME-AF - Installation Place Provision

Hitachi RAS-4HRNME-AF
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PMML0205A rev.4 - 11/2012
24
9.1.2. INSTALLATION PLACE PROVISION
¡
Concrete Foundation
1. Foundation could be on at and is recommended be 100-300
mm higher than ground level.
2. Install a drainage around foundation for smooth drain.
3. When installing the outdoor unit x the unit by anchor bolts of
M10.
4. When installing the unit on a roof or a veranda, drain water
sometimes turns to ice on a cold morning. Therefore, avoid
draining in an area that people often use because it is
slippery.
* Space for downward piping space
Description
Outdoor Unit
Cut this portion of bolt If not, it’s difcult to remove Service Cover
Mortar Hole (Ø100xDepth 150)
Anchor Bolt M10 (Ø12.5 Hole)
Drainage (Wide 100xDepth 150)
Drainage
Vibration-proof rubber
5. The whole of the base of the outdoor unit should be installed
on a foundation. When using vibration-proof mat, it should
also be positioned the same way. When installing the outdoor
unit on a eld supplied frame, use metal plates to adjust the
frame width for stable installation as shown in below gure.
INCORRECT
CORRECT
Outdoor unit is
stable
57 mm
Outdoor unit base width
Frame
Metal plate
100 mm or more
Metal plate
Recommended Metal Plate Size
- (Field-Supplied) Material: Hot-Rolled Mild Steel
- Plate (SPHC) Plate Thickness: 4.5 T
Outdoor unit is
unstable
Frame
60mm
Frame width
(Field supplied)
Base width of outdoor unit
57 mm
UNITS INSTALLATION

Other manuals for Hitachi RAS-4HRNME-AF

Related product manuals