2-94
TC-12001
OUTDOOR UNIT
18
P5414950-rev.1
(8) The whole of the base of the outdoor unit
should be installed on a foundation. When
using vibration-proof mat, it should also be
positioned the same way.
:KHQLQVWDOOLQJWKHRXWGRRUXQLWRQD¿HOG
supplied frame, use metal plates to adjust
the frame width for stable installation as
shown in Fig. 5.9.
Fig. 5.9 Frame and Base Installation
Recommended Metal Plate Size (Field-Supplied)
Material: Hot-Rolled Mild Steel Plate (SPHC)
Plate Thickness: 4.5T
(5) The drain water is discharged during the
heating and defrosting operation. Choose
a place where well drainage is available, or
provide a drain ditch.
(6) When installing the unit on a roof or a
veranda, the drain water sometimes turns
to ice in a cold morning. Therefore, avoid
draining in an area where people often use
because it is slippery. If installing such
the area, provide a second drain pan and
perform the drainage.
(7) Use the drain boss set (Optional, DBS-26(L))
when the drain piping work is required to the
outdoor unit. Pay attention that the drain
boss set can not be used in a snow and a
cold area.
$OXPLQXP¿QVKDYHYHU\VKDUSHGJHV3D\
DWWHQWLRQWRWKH¿QVWRDYRLGDQ\LQMXU\
NOTE
Install the outdoor unit on a roof or in an area
where people except service engineers can not
touch the outdoor unit.