EasyManua.ls Logo

Hitachi RCI-4.0FSN3 - Pipe sizes for RAS-(50-54)FSXN1 E (Combination of 4 units)

Hitachi RCI-4.0FSN3
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TC-12001
2-137
AIR PANEL
6
O
Firmly tighten the long screws. If the long
screws are tightened LQVXI¿FLHQWO\ it PD\ cause
the following failures.
O
When there is still the gap even after tightening
¿UPO\ the ORQJ screws VXI¿FLHQWO\ readjust the
height of the indoor unit.
O
The indoor unit height is adjustable from the
corner hole if the levelness of the indoor unit,
the drain piping, etc. are not affected by the
adjustment.
NOTE:
The VLJQL¿FDQW height adjustment ZLOO cause water
leakage from the drain pan.
< For P-AP160NA1 >
Attach the corner pocket covers (4 portions) after
the air panel is mounted completely.
(a) Catch the band at the rear side of the corner
pocket cover onto the projection at the air panel
as VKRZQ in the ¿JXUH EHORZ
NOTE:
Catch securely the band onto the projection.
If not, the comer pocket cover may fall down
when removing it so that may cause injury.
9) If using a forming agent after installing the air panel,
avoid touching the forming agent to the air panel.
If the forming agent is touched to the air panel, it
may cause the breakage and the falling down the
air panel. In this case, completely wipe off the
touched forming agent.
NOTE:
Catch VHFXUHO\ the ¿[LQJ KRRNV RI the FRUQHU
pocket cover to the air panel.
(b) Insert the ¿[LQJ KRRNV (2 SRUWLRQV at
A
to the
air SDQHO and insert the ¿[LQJ KRRN (1 SRUWLRQ at
B
to the air panel.
10) Attachment of Corner Pocket Cover
Air Leakage
Smudge
Dewing

Wrench
Band
Projection
Fixing Hook
A
B
Fixing Hook
B
A
A

Other manuals for Hitachi RCI-4.0FSN3

Related product manuals