5.5.2 When IED has front port with RJ-45..................................................................................25
5.6 Writing an application configuration to the IED................................................................... 30
5.7 Using the RTXP test switch ................................................................................................30
5.8 Checking the binary input/output circuits.............................................................................30
5.8.1 Binary input circuits........................................................................................................... 30
5.9 Checking optical connections..............................................................................................30
Section 6 Configuring the IED and changing settings..............................................33
6.1 Overview............................................................................................................................. 33
6.2 Supervision of input/output modules................................................................................... 33
Section 7 Establishing connection and verifying the IEC 61850 communication..35
7.1 Overview............................................................................................................................. 35
7.2 Setting the station communication...................................................................................... 35
7.3 Verifying the communication .............................................................................................. 35
Section 8 Testing IED operation..................................................................................37
8.1 Preparing for test.................................................................................................................37
8.1.1 Requirements....................................................................................................................37
8.1.2 Preparing the IED to verify settings...................................................................................38
8.2 Activating the test mode......................................................................................................38
8.3 Preparing the connection to the test equipment..................................................................39
8.4 Connecting the test equipment to the IED...........................................................................39
8.5 Releasing the function to be tested.....................................................................................40
8.6 Forcing of binary input/output signals for testing.................................................................41
8.6.1 Forcing concept.................................................................................................................41
8.6.2 How to enable forcing........................................................................................................41
8.6.2.1 Enable forcing using TESTMODE function block.........................................................41
8.6.3 How to change binary input/output signals using forcing.................................................. 41
8.6.3.1 Forcing by using PCM600............................................................................................41
8.6.4 How to undo forcing changes and return the IED to normal operation............................. 43
8.6.4.1 Undo forcing by using TESTMODE component...........................................................43
8.6.4.2 Undo forcing by using PCM600................................................................................... 43
Section 9 Testing functionality by secondary injection............................................45
9.1 Testing disturbance report...................................................................................................45
9.1.1 Introduction........................................................................................................................45
9.1.2 Disturbance report settings............................................................................................... 45
9.1.3 Disturbance recorder (DR)................................................................................................ 45
9.1.4 Event recorder (ER) and Event list (EL)............................................................................46
9.2 Identifying the function to test in the technical reference manual .......................................46
9.3 Control.................................................................................................................................46
9.3.1 Apparatus control APC......................................................................................................46
9.4 Logic....................................................................................................................................46
9.4.1 Tripping logic, common 3-phase output SMPPTRC .........................................................46
9.4.1.1 Three-phase operating mode.......................................................................................46
9.4.1.2 1ph/3ph operating mode ............................................................................................. 47
Table of contents 1MRK511447-UEN Rev. E
2 Switchgear control unit SAM600-IO
Commissioning manual
© 2017 - 2023 Hitachi Energy. All rights reserved

Table of Contents

Related product manuals