125% FIELD LOAD TESTING / OVER-WEIGHT BYPASS
Each hoist is factory load tested prior to shipment. If a field load test is required, you will need to bypass the over-weight signal.
To bypass the over-weight signal, locate the bypass terminal knife disconnect it should be labeled “BPS” (use images below as
reference) and pull the yellow/orange tab to open.
IMPORTANT - Be sure to close the over-weight bypass terminal knife disconnect “BPS” after the load test is complete, failure to do
so may result in damage to the hoist in the case of an overload.
NOTE Detroit Hoist recommends that 125% load tests should only be conducted by operating the hoist in low speed when the
125% load is suspended or the VFD may fault.