EasyManua.ls Logo

HOKLARTHERM Riga User Manual

Default Icon
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
ALUMINIUM
GREENHOUSE
Riga S/Riga
Basic kit
assembly instructions
Subject to technical changes!
Current as of 09/2013
model Riga S
system width 2,32 m
system width 2,96 m
model Riga
Question and Answer IconNeed help?

Do you have a question about the HOKLARTHERM Riga and is the answer not in the manual?

HOKLARTHERM Riga Specifications

General IconGeneral
BrandHOKLARTHERM
ModelRiga
CategoryGreenhouse Kit
LanguageEnglish

Summary

Parts and Parts List

Customer Service Contact Information

Contact details for customer support and inquiries.

Greenhouse Location Advice

Guidance on choosing the optimal placement for the greenhouse.

General Safety Warnings

Important safety precautions for assembly and use.

Required Tools for Assembly

Assembly Tips and Precautions

Important tips for assembly, including seal insertion and screw placement.

Glazing Information and Care

Silicone Sealant Warning

Warning regarding the use of neutral cure silicone for glazing.

Greenhouse Cleaning and Care

Instructions for cleaning the greenhouse structure.

Optional Foundation Frame

Setting Up the Foundation Frame

Step-by-step guide for setting up the foundation frame.

Foundation Frame Assembly

Greenhouse Foundation

Foundation Plan and Dimensions

Strip Foundation Installation

Instructions for building a strip foundation if no frame is used.

Component Checklist: Basic Kit

Accessories Bag Contents

Gable Assembly Procedure

Step 1: Attaching Door Frames

Guide for attaching door frames to the soil profile.

Step 2: Installing Side Windows

Instructions for installing small side windows into the door frame.

Step 3: Inserting Cross Bars

Procedure for inserting cross bars into the glazing.

Step 4: Connecting Door Frames

Attaching connecting plates to vertical and horizontal door frames.

Gable Assembly Procedure (Continued)

Step 5: Corner Connector and Glazing

Connecting corner connectors and positioning triangular glazing.

Step 6: Mounting Cross Bars

Sideways mounting of cross bars using self-tapping screws.

Step 7: Rear Gable Assembly

Instructions for assembling the rear gable, including cross bar attachment.

Roof Window Assembly Tips

T-Seal Installation for Openings

Guidance on installing T-seals for all doors and windows.

Roof Window Assembly

Correct Roof Window Mounting

Visual guide to correct and incorrect mounting of the roof window.

Seal Insertion in Roof Window Area

Window Opener User Guide

Window Opener Assembly Instructions

Step-by-step guide for assembling and installing the window opener.

Window Opener Adjustment

How to adjust the window opener for desired opening temperature.

Window Opener Winter Storage

Recommendations for storing the window opener during winter.

Divided Revolving Door Profiles (Bottom)

Divided Revolving Door Assembly (Bottom)

Divided Revolving Door Profiles (Top)

Divided Revolving Door Assembly (Top)

Rear Window Profiles

Rear Window Assembly

Eaves Assembly Procedure

Step 8: Attaching Soil Profiles

Connecting lateral soil profiles to the corner bracket on the gable.

Step 9: Installing Ridge Profile

Introducing and securing the ridge profile to the gable.

Step 10: Inserting Side Glazing

Sliding side glazing into the soil profile and rand rung.

Eaves Assembly Procedure (Continued)

Step 11: Inserting Side Rungs

Inserting side rungs into the ridge profile and soil profile.

Step 12: Connecting Plates

Securing connecting plates with screws and nuts.

Step 13: Inserting Remaining Parts

Inserting the remaining plates and rungs to complete the structure.

Eaves Assembly Procedure (Continued)

Step 14: Door Gable and Mounting Corner

Attaching the pre-mounted door gable and inside mounting corner.

Step 15: Door and Window Installation

Instructions for installing doors and windows (see pages 12-21).

Step 16: Stabilization Angle Attachment

Screwing stabilization angles to the side rungs for added stability.

Glazing Plan with ISO-Cellular Sheets