9 - 4
eBase Clamp-on Ferrite Core Installation
We recommend that you install the clamp-on ferrite core included with your Dolphin eBase on your
Ethernet cable.
Installation of the ferrite is required to meet the declared FCC emission levels.
The following illustration shows how to install the ferrite on the cable. It should be placed approximately
1.57 inches (40mm) from the RJ45 plug. The cable should be looped around the core, as shown.