C300 Controller installation
C300 Controller assembly
R301.1 Experion C300 Controller User's Guide 23
11/06 Honeywell
Table 3 C300 Controller IOTA Board Connector Summary
C300 IOTA Board Description
F1 Fuse
IOL1A, IOL1B (BLUE)
IOL2A, IOL2B (GRAY)
Redundant IOLINK connectors for IOLINK 1 and
IOLINK 2
FTEA, FTEB
Fault Tolerant Ethernet (FTE) network
connectors
FTE A network cables are Yellow.
FTE B network cables are Green.
REDUNDANCY Redundant private path cable connector.
Redundancy cable is Orange
MEMORY HOLD-UP Battery Backup cable connector
Battery cable is a twisted pair.
GPS (Currently not used) GPS cable connector
FTE DEVICE INDEX
100, 10, 1
Three rotary decimal switches used to set the
FTE network address (Device Index) of the
controller.
See Step 9 of the C300 Controller Installation
procedure for setting the address.
Prerequisites
Before you install the C300 Controller you should have:
A control cabinet installed with appropriate carrier hardware for mounting Series C
control hardware.
A Series C power supply and optional battery backup hardware installed in the
cabinet.
Installed pair of Control Firewall (CF9) assemblies.
The necessary parts for installing C300 Controller to the control system. See Series
C System Cabling in the Control Hardware Planning Guide for cable hardware