EasyManua.ls Logo

Honeywell Fire-Lite Alarms MS-9050UD - Chassis and Main Circuit Board Installation

Honeywell Fire-Lite Alarms MS-9050UD
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
40 MS-9050UD PN 52413:C 01/23/08
2.2 Mounting Chassis/Transformer/Main Circuit Board
One transformer is supplied standard with the control panel. Install the transformer and chassis in
the location indicated in the following illustration.
6. When the location is dry and free of construction dust, install the chassis/transformer/circuit
board assembly.
7. Mount the chassis to the backbox by aligning the two mounting tabs with the slots in the
backbox, then position the two mounting hole tabs over the studs with nuts located in the
upper portion of the backbox.
8. Slide the tabs located on the bottom of the chassis into the mounting slots in the backbox by
pressing the chassis down.
9. Secure the chassis to the backbox by tightening the two mounting nuts (#10-32) at the top,
and to ensure proper grounding, use a 3/8” nut driver or socket.
10. If the main circuit board is not already attached to the chassis, install it by positioning the ten
mounting holes over the studs on the chassis and secure with the supplied screws.
11. Ensure the transformer plug is connected to Connector J2 on the FACP main circuit board
12. Complete the installation as detailed in the following sections.
Figure 2.2 Main Circuit Board/Chassis Installation
Backbox
FACP Main Circuit Board on Chassis
mounting stud
mounting stud
9050udbdmn.cdr
mounting slot
mounting slot
mounting tabs
mounting tab holes
Ground Stud
Transformer is mounted to the back of the
chassis in the lower left corner.

Table of Contents

Related product manuals