EasyManua.ls Logo

Honeywell Gamewell-FCI ILI-S-E3 - Cabinet D, E3-INX-D Plate Installation

Honeywell Gamewell-FCI ILI-S-E3
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E3 Series Installation/Operation Manual P/N 9000-0574:I 11/04/10 85
Cabinets Installation
2.5.10.4 Cabinet D, E3-INX-D Plate Installation
1. Mount the ILI-MB-E3/ILI95-MB-E3/ANX over the standoffs on the E3-INX-D plate and
secure the eight (8), standoffs, (3/16” hex, #4-40 x 1”) in the eight-hole mounting pattern as
shown in Location 1 of Figure 2.5.10.4.2.
2. Mount the DACT-E3 and the RPT-E3 on top of the ILI-MB-E3/ILI95-MB-E3/ANX and secure
the eight (8), screws (#4-40 x 1/4”) into the eight (8), standoffs as shown in Location 2 of
Figure 2.5.10.4.2.
3. Mount the INI-VG on the E3-INX-D plate and secure the six (6), screws (#4-40 x 1/4”) into
the six-hole mounting pattern as shown in Location 3 of Figure 2.5.10.4.2.
4. Mount the PM-9/PM-9G on the E3-INX-D plate and secure the six (6), screws (#4-40 x 1/4)
into the six-hole mounting pattern as shown in Location 4 of Figure 2.5.10.4.2.
5. Mount the AM-50 Series amplifiers on the E3-INX-D plate and secure the (8). screws (#4-40 x
1/4”) into the eight-hole mounting pattern as shown in Location 5 of Figure 2.5.10.4.2.
6. Mount the AM-50 Series amplifiers on the E3-INX-D plate and secure the eight (8), screws
(#4-40 x 1/4”) into the eight-hole mounting pattern as shown in Location 6 of
Figure 2.5.10.4.2.
Figure 2.5.10.4.1 Cabinet D, E3-INX-D Plate (Standard View)
ILI-MB-E3/ILI95-MB-E3/ANX
AM-50 SERIES
DACT-E3 RPT-E3
INI-VG
SERIES
PM-9/PM-9G
AM-50 SERIES
PM-9/PM-9G PCB

Table of Contents

Related product manuals