3. Process Insertion
Pressure models
26 OneWireless XYR 6000 Transmitters Quick Start Guide Revision 12
February 2013
General piping guidelines
When measuring fluids containing suspended solids, install permanent valves at regular intervals to blow-
down piping.
Blow-down all lines on new installations with compressed air or steam and flush them with process fluids
(where possible) before connecting these lines to the transmitter’s meter body.
Be sure all the valves in the blow-down lines are closed tight after the initial blow-down procedure and
each maintenance procedure after that.
Mount transmitter vertically to assure best accuracy. Position the spirit balance on pressure connection
surface of AP body.
Figure 3-3 Flange Mounting