EasyManua.ls Logo

Honeywell RAEGuard 2 PID - Wiring Procedure

Honeywell RAEGuard 2 PID
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RAEGuard 2 PID User’s Guide
15
To reassemble the instrument:
1 Reconnect the 24-pin connector of the ribbon cable and lock it in
place.
2 Fasten the cable to the board.
3 Mate the board with the clip on the left side and tilt it over.
4 Click the board into place.
5 Screw on the sensor, making sure not to block the gas inlet hole
and connectors.
6 Screw on the housing top.
7 Screw down the fastening bolt.
6.3 Electrical Wiring
The detector connects to peripheral equipment via three terminal
blocks. These blocks accept 12AWG to 24AWG wire (0.2 to 4.0
mm
2
).
Terminal blocks

Related product manuals