EasyManua.ls Logo

Horizon Fitness Perfect Binder BQ-260 User Manual

Horizon Fitness Perfect Binder BQ-260
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
I
BOOK BINDER
BOOK BINDER
060404/BQ260/06E/DV UM202001-06
Important Information
- This manual is designed to help you to install, operate and maintain Perfect Binder BQ-
260/260L. Read, understand and keep this manual in a safe and convenient place.
- Do not operate BQ-260/260L until you read and understand the instructions in this
manual.
- Horizon International Inc. shall not be liable for incidental consequential damages result-
ing from : improper or inadequate maintenance by customer; unauthorized modification or
misuse; operation outside of the environmental specifications for the product.
- Horizon International Inc. pursues a policy of continuing improvement in design and
performance of the product. Therefore, the product design and specifications are subject to
change without prior notice and without our legal obligation.
- All rights are reserved. No part of the manual may be photocopied, reproduced or trans-
lated to another language without the prior written consent of Horizon International Inc.
BQ-260/260L

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Horizon Fitness Perfect Binder BQ-260 and is the answer not in the manual?

Horizon Fitness Perfect Binder BQ-260 Specifications

General IconGeneral
BrandHorizon Fitness
ModelPerfect Binder BQ-260
CategoryBinding Machine
LanguageEnglish

Summary

Installation Instructions

BQ-260 Installation Guide

Comprehensive guide for setting up and installing the BQ-260 binder.

Before Starting Operation

Safety Device Checks

Procedures to verify the correct operation of safety features before use.

Set Up BQ-260

Nipper Unit Setup

Adjusting the nipper unit for correct stock thickness and cover positioning.

Clamper Unit Setup

How to adjust the opening of the clamper unit for different book sizes.

Melt Tank Setup

Setting the glue film thickness and glue temperature for the melt tank.

Test Binding Procedures

Performing test bindings to confirm unit setup and calibration.

Operation Procedure

Cover Binding Operation

Step-by-step guide for performing binding operations with covers.

Pad Binding Operation

Detailed procedure for executing pad binding operations.

Maintenance

As-Needed Maintenance

Maintenance procedures that should be performed based on usage or necessity.

Related product manuals