Working Instruction
Document No. :SOP DDD FA Dis-ASS’Y Station
StationStation
Station:
::
:___________
______________________
___________
Name
NameName
Name:
::
: Ver
VerVer
Ver.
..
.:
::
:_____
_____ _____
_____ Date
DateDate
Date:
::
:___________
______________________
___________
Fixture List(Fixture standard) Qty Fixture List(Fixture standard) Qty
Tabulator:
Issuing department:
IE
Wang Fang
If finding some defects, notice the gaffer and assistant
Points for attention:
Take down SW/C and K/B FFC
9(1/1)
Fig.1
1.Take down K/B FFC from MB
CNTR(Fig.1)
2.Take down K/B
3.Take down S/W FFC from MB CNTR
4.Take down SW/C .
1.00
2007/7/20