Working Instruction
Document No. :SOP DDD FA Dis-ASS’Y Station
StationStation
Station:
::
:___________
______________________
___________
Name
NameName
Name:
::
: Ver
VerVer
Ver.
..
.:
::
:_____
_____ _____
_____ Date
DateDate
Date:
::
:___________
______________________
___________
Fixture List(Fixture standard) Qty Fixture List(Fixture standard) Qty
Tabulator:
Issuing department:
IE
Wang Fang
If finding some defects, notice the gaffer and assistant
Points for attention:
22(1/1)
Disassemble RJ11cable, take down screws
1. Disassemble RJ11 Cable (Fig.2)
2. Disassemble MB screws*2(6052A0004501)
(Fig.3).
Torque:1.0 ± 0.5 Kgf.cm
Fig.1
OK
NG
Fig.2
Fig.3
1.00
2007/7/20
Electric-crossing screwdriver
1