EasyManua.ls Logo

HP 6400/8400 - Connecting an EVA6400 Multi-Product Rack to a 0 C6 D Expansion Rack; Connecting an EVA8400 Multi-Product Rack to a 0 C6 D Expansion Rack; Connecting an EVA8400 2 C18 D Rack to a 0 C9 D Expansion Rack; Powering up the Controllers

HP 6400/8400
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Under System Shutdown click Power Down. If you want to delay the initiation of the shutdown,
enter the number of minutes in the Shutdown delay field.
The controllers complete an orderly shutdown and then power off. The disk enclosures then power
off. Wait for the shutdown to complete.
Connecting an EVA6400 multi-product rack to a 0C6D expansion rack
Follow the procedure in Connecting an EVA6400 multi-product rack to a 0C6D expansion rack to
complete the expansion. You can skip the verification step (Step 2).
Connecting an EVA8400 multi-product rack to a 0C6D expansion rack
Follow the procedure in Connecting an EVA8400 multi-product rack to a 0C6D expansion rack to
complete the expansion. You can skip the verification step (Step 2).
Connecting an EVA8400 2C18D rack to a 0C9D expansion rack
Follow the procedure in Connecting an EVA8400 2C18D rack to a 0C9D expansion rack to complete
the expansion. You can skip the verification step (Step 2) for each loop.
Powering up the controllers
To start a storage system, perform the following steps:
1. Verify that each fabric Fibre Channel switch to which the HSV controllers are connected is powered
up and fully booted. The power indicator on each switch should be on.
If you must power up the SAN switches, wait for them to complete their power-on boot process
before proceeding. This may take several minutes.
NOTE:
Before applying power to the rack, ensure that the power switch on each HSV controller is
off.
2. Power on the circuit breakers on both EVA rack PDUs. Verify that all drive enclosures are operating
properly. The status indicator and the power indicator should be on (green).
3. Wait three minutes and then verify that all disk drives are ready. The drive ready indicator and
the drive online indicator should be on (green).
4. Power on the upper controller (Controller A). It takes the role of master controller.
5. Wait 10 seconds and then power on the lower controller (Controller B). It takes the role of slave
controller.
6. Verify that the Operator Control Panel (OCP) display on each controller displays the storage
system name and the EVA WWN.
Connecting the main rack to the expansion rack42

Table of Contents

Other manuals for HP 6400/8400

Related product manuals