Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
1. Loosen K/B screw.
14” * 2. (Fig.1)
15” * 4. (Fig.2)
2. Poke the position marked in white square.
(Fig.3)
Loosen K/B Screws
10(1/1)
Fig.1
Fig.2
Electric cross screwdriver (#1) 1
15”
1
2
3
4
1
2
14”
0.1
2016/10/26
Fig.3