Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
Rip Mylar
1. Rip mylar * 2 from keyboard.
2. Rip mylar * 1 from keyboard.
3. Put the Keyboard in box.
12(1/1)
对齐边缘
14”
15”
Fig.2
Fig.1
Tweezers 1
0.1
2016/10/26