Standard Operation Procedure
Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Vick Weng
NPSU-PPE
Auditor :
C.S. Lee
18(1/1)
Disassemble Power/B FFC
1. Disassemble power button/B FFC from M/B
CNTR. (Fig.1/Fig.2)
Fig.1
0.1
2016/10/26
Fig.1
Fig.2
14”
15”