Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
16(1/1)
1. Disassemble hinge screws * 6
2. Disassemble LCM Fig1/2
扭力值:2.5 ± 0.1Kgf.cm
Fig1
Disassemble LCM
Fig2
1
2
3
5
6
2016/12/05
1.00
Electric cross screwdriver #1 1