Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
13(1/1)
1. Will hinge up to 270 degrees
2. Remove screw
M2.0*5.0(6052A0003501)*6 (picture1)
❖ Torque:2.5 ± 0.2 kgf.cm
❖ screw can not be slipped.
Disassemble Hinge up
图一
1.00
2020/3/21
Screw driver(#1) 1
Panel