Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
2(1/1)
1. Disassemble battery CNTR(picture 1)
2. Disassemble SSD Shielding
Can(6053B1743801) (picture 2)
❖pull shielding can remove the handle is on
the right
Disassembly SSD Shielding Can
1.00
2020/3/21
Picture 1
Picture 2