Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
5(1/1)
1. Unplug all antenna CNTR on WWAN
card and tie the antenna out of the
antenna slot(picture1)
Disassemble WWAN antenna
1.00
2020/3/21
picture1
picture2
NO.6
antenna
NO.5an
tenna
No.7
antenna
NO.号
antenna