EasyManua.ls Logo

HP Integrity Superdome SX1000 - Delivery Survey

HP Integrity Superdome SX1000
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5
Site Preparation
Pre-Installation Survey
168
Delivery Survey
The delivery survey form shown in Figure 5-18 on page 169 and Figure 5-19 on page 170 lists delivery or
installation requirements. If any of the items on the list apply, enter the appropriate information in the areas
provided on the form.
Special instructions or recommendations should be entered on the Special Instructions or Recommendations
form. Following are examples of special instructions or issues:
Packaging restrictions at the facility, such as size and weight limitations
Special delivery procedures
Special equipment required for installation, such as tracking or hoists
What time the facility is available for installation (after the equipment is unloaded)
26. Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
Cooling
No. Area or condition Yes No
27. Can cooling be maintained between 68° and 86°
(20° and 30° C)?
28. Can temperature changes be held to 9°
(5 ° C) per hour?
29. Can humidity level be maintained between 40%
and 55%?
30. Are air conditioning filters installed and clean?
Storage
No. Area or condition Yes No
31. Are cabinets available for tape and disc media?
32. Is shelving available for documentation?
Training
No. Area or Condition
33 Are personnel enrolled in the System
Administrator’s Course?
34 Is on-site training required?
Table 5-8 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment or date
Comment
or Date

Table of Contents

Other manuals for HP Integrity Superdome SX1000

Related product manuals