Chapter 2
Installing the System
Performing a Visual Inspection and Completing the Installation
75
Performing a Visual Inspection and Completing the Installation
After booting the system, carefully inspect it and reinstall the EMI covers. Here are the steps required to
perform a final inspection and complete the installation:
Step 1. Visually inspect the system to verify that all components are in place and secure.
Step 2. Check that the cables are secured and routed properly.
Step 3. Check that the cell board ejectors are secure.
If the ejectors are broken or open, the cell board is disconnected.
Figure 2-54Cell Board Ejectors7
Step 4. Reinstall the front EMI panel.
1. Hook the flange at the lower corners of the EMI panel into the holes on the cabinet.
Cell Board Ejector
Cell Board Ejectors
See Detail