6. Connect the static earthing clamps from one material loading tank lid to the other.
NOTE: If you are using only one material loading tank, connect it to the external tank lid.
Fill the material loading tanks from the bulk material supply
The recommended method is to create your own infrastructure to transfer the material according to the
r
equirements of the material. Check the form in which the material supply arrives, and its requirements.
The customer is responsible for tracking bulk material usage and material loading tank contents.
You should maintain logs that, at minimum, track the history of the bulk material received (part number,
lot number, expiration date, and so on). In addition, each material loading tank requires identification
of the bulk material details (part number, lot number, expiration, fill sequence) and any other relevant
remarks (such as date of filling). The material loading tank details should be placed in a visible area.
CAUTION: It is important to transfer only material into the processing station. Your own infrastructure
mus
t protect against the suction of small parts into the processing station, which can cause safety
hazards and malfunctions.
You can connect an material loading tank to the processing station: it is capable of transferring the
mat
erial. At the front panel, tap the icon
, then Fresh material > Offload.
IMPORTANT: Ensure that the material type in the bulk supply is the same as the material currently
loaded in the processing station.
Ensure that the material loading tank does not contain any other material type.
If you want to change to a different type of material, first clean the inside of the tank with an explosion-
protected vacuum cleaner (do not use cleaning products). Also clean the pipe thoroughly, removing all
material.
1. Remove the clamp, the tap, and the rubber from the top of the processing station.
Fill the material loading tanks from the bulk material supply 143