EasyManua.ls Logo

HP Jet Fusion 5200 Series - Page 92

HP Jet Fusion 5200 Series
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Open the processing-station door, put the natural cooling unit on the build unit, and ensure that it is
properly attached.
Check that:
The build unit overflows are empty.
The natural cooling unit is correctly attached to the build unit, with the latches closed.
You cannot pull up the natural cooling unit without opening the latches.
CAUTION: HP recommends leaving the build unit in the processing station while attaching the
natur
al cooling unit. If you first remove the build unit from the processing station, it is your
responsibility to use the recommended personal protective equipment (see
Personal protective
equipment on page 14) and to avoid the risk of explosion.
NOTE: The processing station should automatically detect and identify the natural cooling unit. If
it doe
s not, check that the unit is correctly positioned and attached. If necessary, contact your
service representative.
Extracting the build to the natural cooling unit 85

Table of Contents

Related product manuals