EasyManua.ls Logo

HP LaserJet 2100 - Page 83

HP LaserJet 2100
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C4170-90959
Sequence of Operation
71
Power On Sequence
The sequence from power on until the printer enters the STBY period is as follows:
1 Power on.
2 CPU initialization.
3 Video interface communication start.
4 Fusing heater drive.
5 Main motor and fan drive.
Determines the paper detection status of each sensor in the printer immediately before
driving the main motor, and assesses a paper jam if residual paper is detected.
6 High voltage control.
Determines whether or not the toner cartridge is installed, and if so cleans the transfer
charging roller after the primary charging AC bias is turned on.
7 Residual paper check.
After starting the main motor, checks again for residual paper in the printer. If it finds
paper, the printer assesses a paper jam or automatically delivers the residual paper
according to the situation.
8 Failure/abnormality check.
In the steps above, the printer detects any door open condition, fan motor failure, or
fusing assembly failure when they occur.

Related product manuals