EasyManua.ls Logo

HP ML350 - ProLiant - G6 - Page 61

HP ML350 - ProLiant - G6
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal and replacement procedures 61
To replace the component:
1. Install the spare system board in the server before installing the processor.
2. Prepare the processor socket on the spare system board:
a. Open the processor retaining latch and the processor socket retaining bracket.
b. Remove the processor socket protective cover.
3. Install the processor socket cover onto the processor socket of the failed system board.
4. Install the processor on the spare system board.
CAUTION: The processor is designed to fit one way into the socket. Use the alignment guides
on the processor and socket to properly align the processor with the socket. Refer to the server
hood label for specific instructions.
CAUTION: Always install the processor parallel to the system board to avoid damage to the
pins.

Related product manuals