Standard Operation Procedure
Document No. : Grizzly disassembly SOP Station:
Operation Name : Ver. : Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Separate Hinge up & Base unit
10(1/1)
1. Open LCD to 160 degree.
2. Loosen Hinge screw *6pcs and disassembly
Base unit to separate hinge up and Base unit.
❖Torque:3.0 ± 0.2 kgf.cm
❖ screw can not be slipped.
Screw driver 1
1.00
1
1
2
3
2
4
2020/09/15