Standard Operation Procedure
Document No. : Grizzly disassembly SOP Station:
Operation Name : Ver. : Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Disassembly Bezel-2
21(2/2)
1. After heating the bezel 25s by 60 °C, then use the thickness jig to separate bezel and
panel, disassembly priority as below showing 1~2~3~4,
Attention: First, separate bezel adhesive, and then release bezel hook. Try to avoid pressing
panel to damage glass while tear down bezel.
Thickness jig 1
Hair dryer 1
1
2
3
4
3
1.00
2020/09/15