Standard Operation Procedure
Document No. : Grizzly disassembly SOP Station:
Operation Name : Ver. : Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Disassembly EDP Cable and FFC
24(1/1)
1.Tear down EDP cable from panel connector.
2. Take out EDP cable from trough.
3. For Privacy panel, disassembly FFC from panel connector.
1.00
2020/09/15