Standard Operation Procedure
Document No. : Grizzly disassembly SOP  Station:
Operation Name :               Ver. :    Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Disassembly Base
2(1/1)
1. Use cable jig to separate Base from unit.
Attention: Insert  jig to TOP & Base gap area, then slide jig to separate TOP & Base.
2. Put hands on Base and  TOP corner area, handle Base lift it up while press TOP 
down.
3. Take away the Base from unit.
Cable jig 1
1.00
1
2
3
2020/09/15