Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
1. Rip the AL foil, disassembly the left side WLAN
(MAIN). (Fig.1 / Fig.2)
disassembly WLAN - MAIN
9(1/1)
2013/08/27
0.1
Fig.1
Fig.2