Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly Camera/B (or MIC/B)
1. For camera model : Rip webcam gasket
(6054B0788001) * 2.( Fig. 1 & Fig. 2)
2. disassembly camera/B (or MIC/B) (Hold the
two sides.) (Fig.3)
3. disassembly LCM cable (6017B0440201).
Fig.1
11(1/1)
2013/08/27
0.1
Fig.3
Fig.2