Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly WWAN - AUX
13(1/1)
2013/08/27
0.1
1. Rip the AL foil, disassembly the left side
WWAN (AUX) (Fig.1) and recycle it .
Fig.1
WWAN (AUX)