Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Fig.2
disassembly Door
1. Slide the door latch to the unlock position.
(Fig.1)
2. Remove the door (6070B0686201).
(Fig.1 / Fig.2)
2 (1/2)
Fig.1
0.1
2013/08/23
Door Latch