Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly ODD (or ODD Dummy)
[With ODD SKU]
1. Loosen ODD screw * 1, then remove the ODD.
(Fig.1)
[Without ODD SKU]
1. Loosen screw * 1, then remove the ODD
dummy. (Fig.2)
2 (2/2)
Electric cross screwdriver (#1) 1
Fig.2
Fig.1
0.1
2013/08/23