Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
[ Ignore below procedures for the SKU
without Modem ]
1. Disconnect RJ11 cable from modem. (Fig.1)
2. Separate modem/B from modem. (Fig.2)
disassembly Modem
Fig.1
Fig.2
4(1/1)
0.1
2013/08/23
Electric cross screwdriver #1 1