Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Loosen BTCB Screws
1. Loosen K/B set screw * 2. (Fig.1)
2. Loosen ODD screw - M2x3 (6052A0035101)
* 2. (Fig.1)
3. disassembly RS232 CNTR from M/B.
( Ignore this procedures for the SKU without
RS232 cable) (Fig.2)
Fig.1
Electric cross screwdriver #1 1
1
2
9(1/1)
0.1
3
4
2013/08/23
Fig.2