Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly FFC
1. disassembly power/B FFC , function/B FFC
from M/B. (Fig.1)
2. Rip mylar (6054B1306301) * 2 ( For 2 key top).
(Fig.2)
Fig.1
Power/B CNTR
Function/B CNTR
11(1/1)
0.1
2013/08/23
Fig.2
Mylar
Mylar