Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Loosen Screws
1. Loosen screw - M2.5x6 (6052B0185501) * 2.
(Fig.1)
2. Put the computer on production line. (Fig.2)
Fig.1
Electric torx screwdriver (T8) 1
Fig.2
1
2
12(1/1)
0.1
2013/08/23