Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Loosen BTCB Screws
1. Loosen screw - M2.5x4 (6052A0005201) * 4.
(Fig.1)
Electric torx screwdriver (T8) 1
13(1/1)
0.1
Fig.1
2
1
3
4
2013/08/23