Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly WLAN Card
0.1
2013/08/23
19(1/1)
1. disassembly antenna. (Fig.1 / Fig.2)
2. Loosen screw - M2x2 (6052A0034801) * 2.
(Fig.3)
3. disassembly WLAN card and WWAN bracket.
Fig.1
[WITH WWAN CNTR M/B]
[W/O WWAN CNTR M/B]
Fig.2
Fig.3