Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Loosen Hinge BRKT Screws
5(1/1)
2013/08/27
1. Loosen hinge BRKT screw (6052B0096201)
* 6. (Fig.1 / Fig.2)
Electric cross screwdriver(#1) 1
Fig.1
0.1
1
2
3
4
5
6
Fig.2