2. Open the chassis ears (callout 1), and then tighten the shipping screws (callout 2).
3. Connect all peripheral cables to the server.
4. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
5. If installed, close the cable management arm.