Standard Operation Procedure
Tabulator: Issue Department:
Xin-Xin Chen NPSU-PPE
Auditor :
Ethan Lai
Steps:
Document No. : Pegasus600 DISASS’Y SOP Station :
Operation Name : Ver. : Date :
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Unscrew ODD SATA CNTR
14(1/1)
2017/5/23
1.00
1. Unscrew (Torx Pin-Head × 2) all joints of
ODD SATA CNTR, then take out ODD cable
(Fig. 1, 2).
Don't pull the cable using force.
Torsion: 4.0 ± 0.5 kgf.cm
Take the screwdriver vertically to the screw
holes.
Glove Requirements: Half-finger gloves
Fig. 2
Electric Screwdriver (S-4000MS) 1
Bits Type: T15,φ=5mm,L=60mm 1
Fig. 1
1
2
ODD cable